Subscribe to our newsletter and benefit from the latest news on cold chain logistics
RegisterDownload the Product Catalogue
Download
Adjacent
to the 7,000m² production site based in the Artoipole industrial estate
at Monchy-le-Preux, at a few minutes from Arras in the north of France,
the Sofrigam cooling packing production plant has been equipped with a
new building.
A 3,000m² warehouse for the storage of finished products
and raw materials was built. In compliance with Sofrigam's environmental
policies, this warehouse is fitted with a wind turbine which will
supply the equivalent of the office electricity consumption for 8 to 9
months, low consumption lighting and a tank for the collection of
rainwater for the toilets. Resolutely green, the cladding of this new
building was built exclusively using wood, and the building was equipped
with high performance insulation, the same that we use in our packing:
polyurethane.
This new area will make it possible for Sofrigam to increase its storage areas in order to develop its just-in-time delivery service and make it possible to ensure the management of ever increasing safety stocks for its customers.